Building Revision Schedules

You can build a revision schedule when you want to indicate to a supplier that a schedule should be replaced.

The revision schedule is the result of a new build schedule that uses the same supplier/site/organization(s)/items build criteria as the original schedule.

For example, if you send a weekly planning schedule to your supply base on Monday with the schedule number 19951016-seq-0 before discovering a significant MPS loading error on Tuesday, you will want to regenerate and transmit the planning schedule as 19951016-seq-1.

arrow   To build a revision schedule:

1. Navigate to the Find Supplier Schedules window.

2. Select the Build option button.

3. Select the Revision option button.

4. Select a Schedule Number and Revision.

Attention: You must enter the Schedule Number of the schedule you want to revise.

5. Choose Build.

The Supplier Schedules window is displayed, where you can view, edit, and confirm your revised schedule.

6. Choose Clear to clear all current build criteria.

Related Topics

Related Topics

Building New Schedules