The Line Operation Tree and Process Tree windows display your product synchronizations for your routing network in a tree hierarchy format. The Graphical Line Designer Workbench enables you to modify the routing network tree - you can create, delete, cut, and paste line operations, processes, and events.
Select either the Line Operation Tree or Process Tree tab to display the hierarchical view of the routing network.
Left-click with your mouse to select a node detail on the tree hierarchy.
In the right pane the top level of the routing for this item displays.
Expand the items on the routing to display the operations or processes in the routing.
The code and description are listed for each line operation and event.
You can change the tree format to one of three styles. The toolbar has an option that enables you to see the times associated with each line operation and event. See: Workbench Toolbars
The last node at the bottom of the tree is named Unassigned Events. This a place holder for all the events that are on the Routing but are not assigned to any line operation or process. For example, an event may be unassigned because you defined processes first, and have not assigned the events to the operations.
Select a detail on the tree and right-click to display the pop up menu.
The pop up menu displays, depending on the conditions, several options: Cut, Paste, Delete, Properties, and Standard.
Select an event and drag it to another line operation.
Routing calculations are automatically performed.
Save your work.