Pull Sequences are used to view, update, and define the source of replenishment for a kanban planned item in a kanban location. You can use the Graphical Kanban Workbench to create, move, and delete pull sequences.
Select a node detail on the tree.
The tree hierarchy only displays items that already have pull sequences defined. The replenishment chain displays in the right pane.
Select a kanban source type icon from the toolbar, and select a location to place the pull sequence on the right pane canvas See: Workbench Toolbar
The Location window displays with different fields, depending on your replenishment source:
If you select Organization, select the source organization and subinventory. If the organization, subinventory, or item is under locator control, you must also enter a stock locator. See: Assigning a Completion Subinventory and Locator
If you select Supplier, you can optionally select the supplier and supplier site. If you do not select a supplier, Oracle Purchasing will choose the supplier based on sourcing rules when it creates a purchase order/blanket release.
If you select Subinventory, select the source subinventory, and stock locator if applicable.
Additional Information: If you choose a subinventory with no locator control - you can specify a locator on the item master, the bill of material, and the source of the pull sequence - but the system uses the locator value for planning only. It is not transacted at the location level.
If you select Production, optionally enter the line code.
Select the Connector icon to join the objects together to form a replenishment chain. Select the location and drag from the point of supply to the point of use.
Connect the objects together - starting with the sub-inventory/locator closest to your production. When you create the link, the Pull Sequence window appears. Enter details about the Point of Use and in the Point of Supply. See: Pull Sequence Window .
Save your work.