Processing Multiple BEE Batches Together

You can use the Batch Summary window to validate, transfer, or purge several batches in a single action.

arrow icon   To process multiple batches:

  1. Query the batches by name, status, or reference id in the Batch Summary window.

  2. Use the Process check boxes to select the batches you want to process. You can use the Select All button to check all the boxes, then uncheck some as required.

    Attention: Do not select multiple batches that contain the same assignments. The batches are processed at the same time, and interlock problems may arise if two processes try to process the same assignment. To avoid this, ensure your batches contain separate sets of assignments.

  3. Choose the Process button and select the process you require (Transfer, Validate, or Purge) and choose Start. The system displays the concurrent request IDs for the batches so that you can query them on the Requests window.

  4. When the concurrent requests are completed, the Batch Summary window displays the status of each batch and you can review any errors.

    See: Reviewing BEE Process Results.